INSULATION (LNG-FTI)
Pre-Insulated pipe systems and industrial insulation for LNG, Oil & Gas and Energy sectors, delivering thermal efficiency, durability, reduced onsite work and certified quality.
What we deliver
Pre-Insulated pipe systems for LNG and high-thermal industries
Insulation is critical for managing heat gain/loss and improving energy efficiency in LNG, Oil & Gas and energy facilities. Our pre-insulated pipe systems combine factory-level insulation installation with field integrity — meaning pipes are insulated off-site in controlled conditions, then delivered and welded on site for superior thermal performance and quality control.
By moving insulation work to a controlled workshop environment, GC VIVABLAST AUSTRALIA reduces on-site labour, improves health and safety, shortens schedules, and enhances overall quality. Our systems deliver improved thermal efficiency, fewer joints (reducing maintenance and heat loss), and reliable long-term performance.
Why choose us
Our value is built on the following core strengths:
Factory-installed insulation for consistent quality
Reduced onsite labour and HSE risk
Shorter construction schedule and lower cost
Improved thermal efficiency and fewer maintenance points
Suitable for cryogenic to high-temperature services
Engineered for LNG, Oil & Gas, and energy industries
What’s included
The service is delivered through advanced capabilities, including:
Pre-Insulated pipe preparation and insulation application
Thermal insulation materials for −190°C to high steam temperatures
Seamless insulation layering and outer protective jacket
Inspection, verification, and documentation
Delivery and support for field welding joints insulation
Optional acoustic and fire-resistant insulation solutions
How We Work
GC VIVABLAST Australia follows a structured, safety-driven delivery methodology:
Plan – Tailored engineering assessment of thermal requirements
Inspect – Pre-site study and quality checks on pipe surfaces
Execute – Factory insulation with certified processes and materials
Verify – Final inspection and performance documentation
-
We review site conditions, risks and operational goals to build a precise work plan.
-
Our teams follow strict safety protocols and deliver predictable, high-quality outcomes.
-
Robotic, digital or remote systems reduce risk, improve accuracy and speed up delivery.
-
We provide detailed documentation, QA/QC records and future maintenance recommendations.
Proven Capability
-
Project 1
Delivered turnkey pre-insulated pipe systems supporting thermal efficiency and operational reliability at LNG facilities.

-
Project 2
Executed full-scope pre-insulation pipe installation including engineering coordination, materials and insulation works.

-
Project 3
Completed turnkey insulated piping solutions enhancing thermal performance and long-term asset protection for LNG plants.